References
Over 20 years of experience in a one-man company means that each project is managed by an extremely experienced specialist.
Suomen Teollisuuden Energiapalvelut STEP Oy
2021-2022
Layout design for disctric heating control room. Defining of control room furniture and delivery.
Fortum Suomenoja powerplant
2021
Defining of control room furniture.
Loviisa Powerplant LO1
2020 - 2021
Renewal of EY01 emergency backup diesel generator. UI testing.
Loviisa Powerplant LO1
2019 - 2020
Renewal of emergency diesel generator EY03 automation. Testing of user interfaces.
Loviisa Powerplant LO1 & LO2
2019 -
Process computer system renewal. Design of user interfaces.
Loviisa Powerplant LO2
2019
Shift managers’ desk design and serveillance of installation.
Rovakaira Ltd
2019
Electric grid control room layout design and defining of control room furniture.
ADVEN Ltd
2019
Central control room layout design and defining of control room furniture.
Loviisa Nuclear Power Plant - Fortum
2013 - 2018
Turva- ja käyttöautomaation uusiminen (ELSA projekti). Ohjauspaneelien digitointi ja tietokannoitus.
Renewal of security- and usage automation ( project ELSA ). Digitalization and databasing of the control panels.
Valmet Automation
2018
Control room furniture delivery (Ørsted A/S).
Loviisa nuclear power plant - Fortum
2013 - 2018
Replacement of security and operating automation (ELSA project). Digitization of control panels and data base generation
Fortum Loviisa 1 & Loviisa 2
2017
QDS-displays (Qualified Display System) of PPS system (Preventive Protection System) testing with Areva.
Loviisa power plant LO1
2017
Design and installation supervision of the shift manager’s desk.
VR-Group
2016 - 2017
Operating centre layout design and control room equipment configuration.
Vantaa Energy
2015
Operating centre layout design.
Fortum hydropower and trading control room
2015
Control room layout design and control room equipment configuration.
Metso Automation
2014
Delivery of control room equipment (Vimmerby Energi & Miljö AB).
Operating centre – Helen electricity distribution network
2013 - 2014
Control room layout design and control room equipment configuration.
Loviisa nuclear power plant - Fortum
2005 - 2013
Replacement of security and operating automation (LARA project) Control room (main control rooms, auxiliary control rooms…) layout design. Design relating to security and operating automation user interfaces (QDS, OM690). Designing the manual backup system user interface for reactor protection. Design and programming of project-specific applications for the tool software (MicroStation-MDL, Assess-Visual Basic).
Main grid control room - Fingrid
2011 - 2012
Control room (main control room, training control room) layout design, ventilation configuration, and data and electrical cabling configuration.
Coordination of other design relating to control room design (interior design, lighting, control room equipment, adjacent premises, acoustics).
Inkoo power plant, 2nd unit - Fortum
2009
Control room layout design.
Pitkäniemi power plant - Fortum
2008
Control room layout design.
ÅF-Enprima - Kotka Energy
2006 - 2007
Control room layout design.
Control room equipment design.
Process diagram display configuration.
ÅF-Enprima, EKOKEM
2006 - 2007
Control room layout design.
Control room equipment design.
Vilniaus energija, CHP-2 - Vilnius, Lithuania
2005
Design and programming of a boiler protection system (HIMA).
Lenenergo Power Plant 5 – St. Petersburg, Russia
2005
Design, programming, and commencement of serial communication buses between various separate automation systems (boiler protection, turbine protection, block protection) and the main automation system (MetsoDNA).
Northwestern plant – St. Petersburg, Russia
2004 - 2005
Updating project-specific tool software (MicroStation-MDL, Assess-Visual Basic).
Kozienice power plant - Poland
2004 - 2005
Control room layout design.
Budapest Erömü, Kispest power plant - Hungary
2002 - 2004
Control room and automation premises layout design.
Control room equipment design.
Design, programming, and commencement of serial communication buses between various separate automation systems (hydropower plant, steam boilers, hot water boilers, electric system, district heating system, boiler protection, gas turbine, steam turbine) and the main automation system (MetsoDNA).
Biomass power plant - Herbrechtingen, Germany
2002 - 2004
Control room and automation premises layout design.
Control room equipment design.
Large-scale display system design.
Design, programming, and commencement of serial communication buses between various separate automation systems (hydropower plant, steam boilers, hot water boilers, electric system, district heating system, boiler protection, gas turbine, steam turbine) and the main automation system (MetsoDNA).
Conel, Deva power plant - Romania
2000 - 2004
Control room and automation premises layout design. Control room equipment design. Large-scale display system design.
Afferde power plant – Hameln, Germany
2002
Design, programming, and commencement of serial communication buses between various separate automation systems (burners, ammonia feed, fuel conveyors, combustion gas filter) and the main automation system (MetsoDNA).
Budapest Erömü, Újpest power plant - Hungary
1999 - 2002
Control room and automation premises layout design. Control room equipment design. Large-scale display system design. Design, programming, and commencement of serial communication buses between various separate automation systems (hydropower plant, hot water boilers, 120 kV electric system) and the main automation system (MetsoDNA).
Conel, Braila power plant - Romania
1999 - 2001
Control room and automation premises layout design. Control room equipment design. Large-scale display system design.
Conel, the southern power plant in Bucharest - Romania
2000
Control room and automation premises layout design.
Control room equipment design.
Large-scale display system design.
Design, programming, and commencement of serial communication buses between various separate automation systems (hydropower plant, hot water boilers, 120 kV electric system) and the main automation system (MetsoDNA).
Kozienice power plant - Poland
1999 - 2000
Control room and automation premises layout design.
Control room equipment design.
Large-scale display system design.
Edenderry power plant - Ireland
1999 - 2000
Control room and automation premises layout design.
Control room equipment design.
Power system centre - Fingrid
1998
Control room and automation premises layout design.
Control room equipment design.
Olomouc power plant – Czech Republic
1996 - 1998
Control room and automation premises layout design. Control room equipment design.
Design, programming and commencement of automation system user interface (Damatic XD).
Chvaletice power plant – Czech Republic
1996 - 1998
Design, programming and commencement of desulphurisation plant user interface (Damatic XD).
IVO Voimansiirto Oy
1995 - 1998
Area control room (Hämeenlinna, Varkaus, Petäjävesi, Oulu) layout design. Control room equipment design.
Espoo - Espoon Sähkö Oy
1996
Central control room (electrical) layout design. Control room equipment design.
IVO Voimansiirto Oy
1995
Central control room layout design.
Control room equipment design.
Rovaniemi - Kemijoki Oy
1994
Central control room layout design.
Control room equipment design.
Meri-Pori power plant – Imatra Power Company
1991 - 1993
Control room layout design. Control room equipment design. Automation system user interface design (Siemens).
Krško nuclear power plant, Slovenia
1991
Control room layout design.
Control room equipment design.
Loviisa nuclear power plant - Imatra Power Company
1990 - 1991
Design, procurement, and delivery supervision of the shift manager’s desk.
Loviisa nuclear power plant - Imatra Power Company
1986 - 1990
Design and programming of the process computer system user interface (ABB PMS).
Haapavesi power plant - Imatra Power Company
1988 - 1989
Control panel layout design (Manuell mosaic).
Fortum Suomenoja powerplant
2021
Defining of control room furniture.
Loviisa Powerplant LO1
2019 - 2020
Renewal of emergency diesel generator EY03 automation. Testing of user interfaces.
Loviisa Powerplant LO2
2019
Shift managers’ desk design and serveillance of installation.
ADVEN Ltd
2019
Central control room layout design and defining of control room furniture.
Valmet Automation
2018
Control room furniture delivery (Ørsted A/S).
Fortum Loviisa 1 & Loviisa 2
2017
QDS-displays (Qualified Display System) of PPS system (Preventive Protection System) testing with Areva.
VR-Group
2016 - 2017
Operating centre layout design and control room equipment configuration.
Fortum hydropower and trading control room
2015
Control room layout design and control room equipment configuration.
Operating centre – Helen electricity distribution network
2013 - 2014
Control room layout design and control room equipment configuration.
Main grid control room - Fingrid
2011 - 2012
Control room (main control room, training control room) layout design, ventilation configuration, and data and electrical cabling configuration.
Coordination of other design relating to control room design (interior design, lighting, control room equipment, adjacent premises, acoustics).
Pitkäniemi power plant - Fortum
2008
Control room layout design.
ÅF-Enprima, EKOKEM
2006 - 2007
Control room layout design.
Control room equipment design.
Lenenergo Power Plant 5 – St. Petersburg, Russia
2005
Design, programming, and commencement of serial communication buses between various separate automation systems (boiler protection, turbine protection, block protection) and the main automation system (MetsoDNA).
Kozienice power plant - Poland
2004 - 2005
Control room layout design.
Biomass power plant - Herbrechtingen, Germany
2002 - 2004
Control room and automation premises layout design.
Control room equipment design.
Large-scale display system design.
Design, programming, and commencement of serial communication buses between various separate automation systems (hydropower plant, steam boilers, hot water boilers, electric system, district heating system, boiler protection, gas turbine, steam turbine) and the main automation system (MetsoDNA).
Afferde power plant – Hameln, Germany
2002
Design, programming, and commencement of serial communication buses between various separate automation systems (burners, ammonia feed, fuel conveyors, combustion gas filter) and the main automation system (MetsoDNA).
Conel, Braila power plant - Romania
1999 - 2001
Control room and automation premises layout design. Control room equipment design. Large-scale display system design.
Kozienice power plant - Poland
1999 - 2000
Control room and automation premises layout design.
Control room equipment design.
Large-scale display system design.
Power system centre - Fingrid
1998
Control room and automation premises layout design.
Control room equipment design.
Chvaletice power plant – Czech Republic
1996 - 1998
Design, programming and commencement of desulphurisation plant user interface (Damatic XD).
Espoo - Espoon Sähkö Oy
1996
Central control room (electrical) layout design. Control room equipment design.
Rovaniemi - Kemijoki Oy
1994
Central control room layout design.
Control room equipment design.
Krško nuclear power plant, Slovenia
1991
Control room layout design.
Control room equipment design.
Loviisa nuclear power plant - Imatra Power Company
1986 - 1990
Design and programming of the process computer system user interface (ABB PMS).
New message

Kari Rintamäki

Engineer and entrepreneur
+358 50 5818 255
kari.rintamaki@karrcontrol.fi
Business code 20637703, Kerava